Kids, Project SSierra and Winter is coming ..

I know I should have posted ON the day, but I did so on Facebook, and completely forgot to update here. So for the record in the future if/when she ever looks back : Happy birthday Abigail ! Daddy loves you very much.

Kids have been doing AMAZING this school year. Attitudes towards going, ambition and just willingness to do what is expected of them has been incredible. Abby has officially started down the path for her first communion at St. Mary’s church. She stood at the front of the church and did her first reading. She looked about as scared as I remember being any time I had to do things like that. Hopefully she outgrows it and takes on some of her moms personality where public speaking is concerned. I suspect Joe will have fewer problems with that as he seems to love the spotlight.

Halloween has come and went and it was a Super hero good time 🙂 My little Batman and Batgirl were adorable. As were their cousins Reese (Tinkerbell) and Holden (Nemo). I think they all have a good time. They were certainly zonked by time they got home.

With November officially in full swing, I’m sadly starting the preparation to put the Bug and Bike away for the winter. My dad has kindly been working on his garage and setting up a small area for me to put my toys in for their winter nap. Odds are the Bug will be put down this weekend.  And unless the weather warms up a bit, I fear the triumph wont be too far behind.

Project SSierra is under way. I’ve got the stereo system in as well as the power windows, seats and door panels complete. I haven’t ‘finished’ it 100% yet as I’m still doing some work on the transmission and having an alarm installed. Don’t want to button it up knowing I will have to pull stuff apart again within a couple weeks. Once the alarm is in, the interior can be finalized and put together 100%. During the same time, the new transmission should be installed so I can re install the shifter boot to the floor pan. Once that’s all done : off to Paul’s place to have the body work complete. My goal is to have the interior and body work sorted by December 1. Gonna be a busy month.

This entry was posted in Uncategorized. Bookmark the permalink.